Contractor shall: • Construct / infill three interior walls with 8” CMU including new masonry openings. Openings in the new walls will be for interior doors and shall have a header and corner blocks shall be used at the openings. • Construct / infill three exterior walls with 8” CMU without openings. • Tie in new block walls to existing walls, ceilings and slab. • Provide precast lintels above interior doors. • Finish rough block ends at door openings with mortar. • Provide #4 rebar in horizontal bond beams at each infill. • Provide #5 vertical rebar at 24” on center at each infill. • Provide all necessary mortar and sand. • Provide all necessary corrugated ties and drive pins. • Work with NNFD Training staff to schedule work and to locate the storage of equipment, materials and vehicles once work begins. • Work with NNFD Training staff to satisfy any site needs such as water or electricity. • Clean-up trash and any remaining sand.