Irrigation zones on 2 medians surrounding the new golden gate canal bridge were removed during the Golden Gate Canal Bridge Project in 2023-24 and irrigation zones need to be restored to usable condition for future landscape plantings on these 2 medians. Attached is an irrigation architectural plan for the proposed reinstallations to rebuild the area to return it to working order. All required parts will be provided by county. The Lump Sum quote should be calculated based on the irrigation drawings attached. The projected labor hours are an approximation and should be bid as a lump sum. This project will require locates from Sunshine 811, a Valid Collier County irrigation license, and all required insurances to do business on a Collier County Roadway and may require MOT.