1. FXBGO! has 2 locations at its Central Facility and Operations Facility that need additional power termination locations. 2. FXBGO! Central will require several additional power circuits per the supplied engineering documents. 3. FXBGO! Operations Center will require several additional power circuits per the supplied engineering documents. In addition 1 additional grounding location in the IT server closet. 4. Contractor shall obtain and pay for all construction permits, licenses, and certificates of occupancy required. 5. Contractor must be able to be compliant with the Davis Bacon Act. Wage Determination documentation attached. 6. All work and related work for site cleanup and site restoration (ex. Repair, restore, and repaint of any wall damage). 7. See attachments for additional information.