The Project consists of the following major elements. Note asphalt mix shall be Type 1, with Lime. 1 . Milling and asphalt paving on Brookside Drive from East Church Street to Heard Drive (2,280 LF). The work shall include asphalt milling, removal and disposal to a depth of 3” to 4” (Final milled surface should be 1.5” below existing gutter elevation at edge of pavement), and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Existing asphalt to be removed from gutter line. Replace two stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required. 2 . Milling and asphalt paving on Pulliam Street from College Avenue to End (1,550 LF). The work shall include asphalt milling, removal and disposal to a depth of 3” to 4” (Final milled surface should be 1.5” below existing gutter elevation at edge of pavement), and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Mill thru cross street intersections. Existing asphalt to be removed from gutter line. Replace crosswalk (thermoplastic), two stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required. Replace two speed tables in accordance with attached detail, including striping. 3 . Milling and asphalt paving on Edwards Street from South McIntosh Street to Tusten Street (1,650 LF). The work shall include asphalt milling, removal and disposal to a depth of 3” to 4” (Final milled surface should be 1.5” below existing gutter elevation at edge of pavement), and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Mill thru cross street intersections. Existing asphalt to be removed from gutter line. Replace four stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required. 4 . Milling and asphalt paving on Almond Street from Mill Street to Williams Street (1,190 LF). The work shall include asphalt milling, removal and disposal to a depth of 3” to 4” (Final milled surface should be 1.5” below existing gutter elevation at edge of pavement), and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Mill thru cross street intersections. Existing asphalt to be removed from gutter line. Replace four stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required. 5 . Milling and asphalt paving on Third Street from Mill Street to Campbell (780 LF). The work shall include asphalt milling, removal and disposal to a depth of 1.5” below existing gutter elevation, and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Replace two stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required. Replace three asphalt speed bumps in like kind and location, including yellow paint across top surface. 6. Milling and asphalt paving on Elizabeth Street from Carey Street to West Clairmont Avenue (742 LF). The work shall include asphalt milling to a depth of 1.5” using special care to retain existing granite curb, and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Replace two stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required. 7. Milling and asphalt paving on Wallis Street from West Tate Street to Carey Street (732 LF). The work shall include asphalt milling to a depth of 1.5”, and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. Mill thru cross street intersection. Replace two stop bars (thermoplastic), and double yellow (5” paint) centerline striping. No edge striping required