1. HVAC a. Remove the existing evaporative cooling system and associated ductwork as necessary. b. Furnish and install new rooftop combination heating and cooling units. c. Provide and connect new duct work to existing duct system where applicable. d. Install new electrical branch circuits with fuse safety disconnect. e. Install a roof curb to support and seal rooftop units. f. Provide new LP gas lines to the unit. g. Provide new thermostats for each unit. h. Ensure all newly installed equipment is fully operational and meets design specifications. i. Test and balance air output. j. Provide and replace existing grill and registers throughout the building. 2. MEN AND WOMEN RESTROOMS a. Remove existing fixtures and install new ADA-compliant and standard water closets, including angled shut off valves, and supply lines. b. Men’s Restroom i. Furnish a new urinal and flushing valve, mounted at code-compliant height. ii. Remove and replace existing countertops, lavatories, lever-handled faucet shut off valves, supply lines, and drain lines. c. Provide new exhaust fans in both restrooms for proper ventilation. d. Remove and install new accessories in both restrooms, including new mirrors, tissue paper holders, soap dispensers, towel dispensers, and trash receptors with lids. e. Provide new paint to walls and ceiling. Owner will select colors. f. Install new door closures on restroom doors. g. Furnish and install new toilet partitions in both restrooms, compliant with ADA and local code requirements. h. Install automatic air freshener dispensers in each restroom.