1 Overall project mobilization to include project bonds, insurance, etc. LS 1 2 Project mobilization to any well site in Anne Arundel County, based on individual Task Order award, as specified. EA 6 3 Perform all work to obtain authorization under MDE General Discharge Permit No. 17-HT to discharge all water from specified wells in accordance with all applicable guidelines, as specified. EA 6 4 Furnish, install, maintain and remove 20’ tall sound barrier panels, as specified. LF 20 5 Hourly rate, rig crew, to redevelop and/or reconstruct a well, including well preparation and cleanout, sounding the well, removal of sediment, alignment testing, surging, airlift pumping, flow measurements and water disposal, as specified. HR 250 6 Hourly rate, rig and crew, to remove the existing inner casing and screen and prepare an individual well to be underreamed to accept new stainless steel inner casing and screen. HR 50 7 Underream 24 to 30-inch diameter hole below existing outer casing and prepare the hole to accept new stainless steel inner casing, screen, and gravel pack, as specified. LF 50 8 Hourly rate, rig and crew, to install and operate submersible well pumps and conduct pumping tests, as specified. HR 120 9 Hourly rate, Maryland-licensed well driller/pump foreman. HR 60 10 Hourly rate, construction helper. HR 60