- 700 CY Aggregate Base - 100 CY Aggregate Subbase - 900 Ton 19mm Hot Mix Asphalt - 700 12.5mm Hot Mix Asphalt - 170 Ton Hand Placed Pavement - 10 LF 2” Fusible HDPE Water Main - 980 LF 6” DI Water Main - 1,000 LF 8” DI Water Main - 12 LF 12” DI Water Main - 920 LF ¾” Water Services - 2 Hydrant Installations - 1 LS Furnish & Install Temporary Water Services - 57 VF 4’ Dia. Sanitary Manhole, Frame, Cover - 6 LF 6” Solid SDR35 PVC Pipe - 91 LF 8” Solid SDR35 PVC Pipe - 10 LF 12” Solid SDR35 PVC Pipe - 1,000 LF Slipform Concrete Curbing - 210 LF Vertical Granite Curbing Work within Rosedale Street will include new water main construction, miscellaneous sewer main work and full-width street re-paving. Work within Marston Street will include new water main construction followed by trench re-paving. Work within Lincoln Drive will include new water main construction, miscellaneous sewer main work and full width street re-paving.