GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: Unit I: Water Improvements - 96 LF of 6” DR-14 PVC water line - 1,914 LF of 8” DR-14 PVC water line - 79 LF of 12” DR-14 PVC water line - 149 LF of 20” steel casing and 169 LF of 8” ductile iron carrier pipe - Installation and adjustment of water appurtenances such as fire hydrants, combination air valve assembly, service lines with meter and box, gate valves, and utility markers - Water line lowering Unit II: Sanitary Sewer Improvements - 790 LF of 8” SDR 26 PVC sanitary sewer line - Installation and adjustment of manholes, including extra deep manholes Unit III: Paving and Drainage Improvements - 2,157 SY of concrete pavement to be removed - 10,121 SY of asphalt pavement to be removed - 123 trees to be removed - 8,465 CY of excavation and 33,440 CY of fill material - 9,787 SY of concrete pavement - 4,307 SY of asphalt pavement - 11,560 SF of concrete sidewalk - 2,466 SY of sodding and 24,443 SY of seeding - 1,341 LF of RCP (various diameters) and 633 LF of RCB (various sizes) - Installation and construction of storm drain appurtenances such as headwalls, wingwalls, junction boxes, and inlets - 15 street lights to be installed and 1 street light to be relocated - 2 retaining walls to be constructed Unit IV: Mallard Cove Park Improvements - 590 CY of excavation and 2,175 CY of fill material - 37,528 SF of concrete sidewalk - 8,606 SY of seeding - 1 retaining wall to be constructed All correspondence must be made through the Vendor Portal.