1.Disconnection and removal of the existing dimming system and control circuits within the auditorium of the Preston Arts Center. 2.Installation of new distribution equipment and associated feeder circuits. 3.Installation of a new state-of-the-art dimming system, theatrical LED lighting fixtures, control equipment and all required circuits. 4.Feeding existing house lighting fixtures from the new dimming system. 5.Interconnecting the emergency power distribution system with the new dimming system and existing house lighting fixtures as required to provide emergency egress lighting within the auditorium space. 6.Interconnecting the building fire alarm system with the new dimming system and existing house lighting fixtures as required to provide emergency egress lighting within the auditorium space whenever there is a general fire alarm condition.