Base Bid – South-side of the North Dome Parking Lot (see map) Mill depth 4 inches for south-side of the north Dome parking lot with cement stabilization. The parking lot is 190 feet by 220 feet at two 2-inch lifts total of 4 inches and 12 inches of stabilization Project Information: Hot Mix Asphalt Pavement PART 1 – GENERAL 1.01 Section Summary A. Bituminous pavement, bituminous prime, and tack coat. 1.02 References A. North Dakota Department of Transportation “Standard Specifications for Road and Bridge Construction” Current Edition, as revised. 1. Section 401 – Prime, Tack, or Fog Coat 2. Section 420 – Bituminous Seal Coat 3. Section 430 – Hot Mix Asphalt (HMA) 4. Section 816 – Aggregates 5. Section 818 – Bituminous Materials 6. Section 826 – Joint Materials B. North Dakota Department of Transportation “Field Sampling and Testing