Contractor shall remove closet door track, door stops, transition bar, etc. 14.3.1.7 Demolition removal of existing baseboard in bathroom. 14.3.1.8 Clean and prepare floor surfaces throughout the unit to receive new floating plank. (Includes evening out floor if unleveled according to manufacturers instruction) Note: if patching is not a solution for the repair on subfloor, then contracting officer must be notified to approve changes to bid through an addendum. (bathroom) 14.3.1.9 Removal of laminate sheet & toilet to install planks. 14.3.1.10Remove existing baseboard. 14.3.1.11Dispose of all debris resulting from work on a daily basis. 14.3.2 Installation (Kitchen, living room, closets, and bathroom) 14.3.2.1 Install Shaw floating planks 12 mil or equivalent in accordance with manufacture installation instructions throughout the unit. (Color sample must be submitted to contracting officer before installation) 14.3.2.2 Install new shoe base throughout unit. 14.3.2.3 Reinstall all floor stoppers and closet tracks. 14.3.2.4 Contractor must trim any doors if needed for doors to work properly after floor installation...