In general, the Contractor shall supply all labor, materials, tools, and equipment necessary to remove and replace existing sidewalks and drainage repairs at various sites as specified; At a minimum, the work shall include by not be limited to the following items; 1) The Contractor shall provide all labor, concrete materials, tools, and equipment necessary to meet the project’s intent, including conformance to all requirements of the project’s plans and specifications. 2) The Town of Ridgefield shall provide the following materials; a) Catch Basin tops (C and CL) b) Catch Basin sections (precast) c) Catch Basin sumps (precast) d) 15-inch HDPE pipe e) Recycled Process Aggregate 3) The Contractor shall obtain all necessary permits; local fees will be waived.