The general Scope of Work consists of, but is not limited to: Providing all the permits, labor, equipment, materials, tools, transportation, supplies, insurance, incidentals, mobilization, demobilization and maintenance of traffic necessary to: 2.01.01 Install all required erosion control items to properly implement the Stormwater Pollution Prevention Plan (SWPPP) to meet permitting requirements of under the National Pollutant Discharge Elimination System (NPDES) Construction Generic permit. 2.01.02 Clear and grub and regrade existing drainage ditches. 2.01.03 Clear and grub designated stormwater ponds for reshaping. 2.01.04 The contractor will be responsible for the proper removal and disposal of any surplus materials. 2.01.05 Replace disturbed grass areas “in-kind” to their pre-construction conditions...