1 Mobilization 1 LS 2 Inlet Filter, Type 1 816 SF 3 Breakaway Barricade 1 UNIT 4 Drum 1 UNIT 5 Traffic Cone 50 UNIT 6 Construction Signs 135 SF 7 Fuel Price Adjustment 1 ALLOW $2,800.00 $2,800.00 8 Asphalt Price Adjustment 1 ALLOW $2,600.00 $2,600.00 9 Removal of Pavement 703 SY 10 Dense Graded Aggregate Base Course, 6" Thick 575 SY 11 HMA Milling 3" or Less 5,750 SY 12 Hot Mix Asphalt 9.5M64 Surface Course, 2" Thick 680 TON 13 Hot Mix Asphalt 9.5M64 Surface Course, 6” Thick 80 TON 14 Hot Mix Asphalt 19M64 Base Course, 4" Thick 70 TON 15 18" Reinforced Concrete Pipe 64 LF 16 Inlet Type "B" 3 UNIT 17 Reset Existing Casting 24 UNIT 18 Reconstructed Inlet, Type "A", Using New Casting 3 UNIT 19 Reconstructed Inlet, Type "B", Using New Casting 11 UNIT 20 Reconstructed Manhole, Using New Casting 1 UNIT