A. Dams shall be mowed once during the second half of June and once in the third week of October yearly, vendor will provide all labor, equipment, and materials to maintain the vegetation on these Dams: Icehouse Dam - to include from the water's edge of Ice House Pond to water's edge of Walker Coleman Pond, from spillway at west end to woods at Dam groin at east end. Walker/Coleman Dam - to include from water's edge of Walker/Coleman Pond to water's edge of hatchery pond #1, from spillway at south end to access road at Dam groin at north end. The sloughed off portion of Walker Coleman Dam is not to be maintained by the contractor. It is on the Lake side. The area is 50' N of gated pier to shore side tree. Spring Branch Dam - to include the water's edge of Spring Branch Pond to the rock base at the foot of the Dam, from the spillway at west end to the hairpin turn in the road and the Beach at the east end. The foot of each dam is surfaced with large rock (rip-rap). B. Dam Mowing Specifications: The first visit under this award contract will take place in October, 2025, and subsequent visits will be in accordance with the table below. Grass is to be mowed to within 4" of ground Woody growth around the edges of the grass zones are to be killed, cut, and removed All herbicides and pesticides must be applied per label directions All debris shall be removed by the end of the workday in which they were produced.