West End Water, Sewer, and Storm Replacement – Phase 1: Consists of the installation of approximately 2,700 LF of 4-inch to 12-inch DI waterline, replacement of existing domestic and fire services, installation of approximately 1,200 LF of 15-inch to 36-inch stormwater, sanitary sewer / stormwater structures, connections to existing piping, valve assemblies, traffic control, approximately 1,190 LF of 8-inch CIPP installation, replacement and reconnection of existing sanitary sewer services, miscellaneous surface restoration and all associated appurtenances, as described in the Specifications and shown on the Drawings. Main and Broad Street Waterline: Consists of the installation of approximately 1,210 LF of 6-inch and 8-inch DI waterline, replacement of existing domestic and fire services, connections to existing piping, valve assemblies, traffic control, miscellaneous surface restoration and all associated appurtenances, as described in the Specifications and shown on the Drawings.