1. Site work including erosion control, dewatering, clearing and grubbing, site grading, site drainage piping, excavating, trenching, water utility piping, paving, and backfilling. 2. Construction of booster station building including structural fill, footings, below grade walls, and cast-in-place concrete floor. The above-grade walls are CMU block and precast. Roof to be sloped precast planks. 3. Procuring and installing booster pumps, valves, piping, and all necessary connections for a complete and operating system. 4. Installation of new piping to connect booster station to existing distribution pipe, along with required inside piping. 5. Electrical work and related systems, including new electrical service, power distribution equipment and circuitry, grounding system, indoor and outdoor lighting, along with new motor control center, panelboards, lighting transformers, generator, and control equipment. 6. Building heating, ventilating, and air conditioning. 7. Internal plumbing to include building water and drainage.