1. Provide traffic control as necessary for CIPP lining, bypass operations and sanitary sewer manhole access. Traffic control plans shall be submitted to the City for approval and receive a traffic control permit prior to construction activities. 2. Restore area disturbed by construction activities back to pre-construction conditions. 3. When Public Outreach is not performed by the City, provide coordination with Public Outreach Consultant provided by the Contractor for notification of construction activities to the general public, if applicable. 4. Provide all bypass pumping, piping, power, noise control, and odor control including materials, labor and equipment necessary to divert sanitary sewage flows around the rehabilitation construction area as necessary to complete the work. 5. Perform cleaning of sanitary sewer pipe to remove all metallic pipe tuberculation, grease, scale, roots, debris, foreign protrusions and obstructions prior to cured-in place pipe (CIPP) lining. 6. Perform Closed-Circuit Television (CCTV) investigation to confirm appropriate cleaning efforts and identify any pipe conditions that would prohibit cured-in-place pipe (CIPP) lining method of pipe rehabilitation