Building 400: The restrooms are receiving architectural finish upgrades, new restroom accessories and partitions. Plumbing fixtures and light fixtures will be replaced. Building 401: The restrooms are being reconfigured and modernized. Existing exhaust air, supply air, lighting, and power systems will be modified to accommodate the new floor plan. New plumbing fixtures, bathroom accessories, partitions and finishes will be provided in each restroom. Provide new floor finishes, new base and wall finish as indicated on plans. Building 406: Plumbing scope is limited to temporarily removing and then reinstalling floor mounted fixtures to accommodate new architectural flooring. Demo existing floor finishes and resilient base on both floors and replace with new epoxy floor and lvt flooring and resilient base as indicated on plans.