The project includes providing construction supervision, labor, materials, tools, test equipment, and other activities necessary for the Big Ridge No. 2 Pump Station Improvements. The proposed project will include the construction of approximately 120 LF of 10-inch Ductile Iron Pipe (DIP), a sanitary sewer manhole structure, two new submersible pumps, new valves on the existing sanitary sewer downstream, rehabilitation protective coating to the wet well, new canopy, and electrical systems coordination. Bypassing during construction is expected. The pump station is located near the intersection of Gann Store Road and Lake Resort Drive, consisting of a wet well and valve structure, pumps and controls, electrical, site work, and a 10-inch DIP discharge pipeline.