THE STREET RESURFACING PORTION CONSISTS OF HOT-MIX ASPHALT SURFACE REMOVAL AND RESURFACING. THIS PORTION ALSO INCLUDES CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT, PAVEMENT MILLING, SIDEWALK REMOVAL AND REPLACEMENT, PAVEMENT RESURFACING, PAVEMENT PATCHING, ADJUSTMENT OF STRUCTURES, STORM SEWER INSTALLATION, STRUCTURE REPLACEMENTS, AND ALL COLLATERAL WORK NECESSARY TO COMPLETE THE PROJECT AS DESCRIBED HEREIN. SIDEWALK REPLACEMENT PROGRAM SHALL CONSIST OF THE REMOVAL AND REPLACEMENT OF EXISTING SIDEWALK AND CURB IN NEED OF REPAIR THROUGHOUT THE CITY OF BATAVIA. THERE ARE TYPICALLY 1 TO 5 SIDEWALK PANELS AT EACH LOCATION. THE CITY-WIDE REPAIRS ARE LOCATED BEYOND THE LIMITS OF THE STREET RESURFACING WORK. INDIVIDUAL LOCATIONS ARE SHOWN ON THE LOCATION MAP AND THE ATTACHED LOCATION LIST.