Milling of all asphalt to the stone base, repair of base where necessary, compaction, installation of 2.5 inches of binder (min), 1.5 inches of top coat (min), and striping to pre-approved drawings. Wyoming County Dump Trucks/workforce to haul all milled materials from site, continuous rotation of four 10 wheelers hauling materials locally (Milling and sub base materials ONLY) • Besides County owned trucks, all construction equipment and material are to be provided by the contractor Alterations of daily parking lot operations will take place during the timeline of the project o Note: construction needs to take place while maintaining multiple safe entry and exit points for public and employee foot traffic to and from the facility. Contractor to Repair any compromised or soft spots within the gravel. Gravel base (clean) should be a minimum of 8 inches thick in all areas, and it is the duty of the contractor to ensure any non-gravel or "dirty" base material is removed adding and compacting new gravel to the proper grade. o Note: as base materials are unknown, please submit bid with allowances for 400 ton of Crusher #2 gravel. (any/all additional material to be proposed as a project change order) Asphalt Material Installation - Minimum of 2.5 inches of HOT asphalt binder w/ a minimum of 1.5 inches of HOT asphalt top coat. Asphalt is to transition to all sidewalks, roadways, drainage devices, etc. without possibility of trip hazards. Grade set so all water sheds towards DIs and/or away from lot.