The scope of work associated with this project will consist of either installing subsurface drain lines along both sides of Barataria Blvd. between the floodwall (near Merlin Lane) to the south and Pritchard Road to the north (approx. 2.92 miles), excavating the existing swales and ditches to enlarge and deepen them to a size adequate for proper drainage, or a combination of these two options. The work may require backfilling, grading, and sodding, replacement of utility service connections, installing reinforced concrete pipe, asphalt roadway patching, and removal and replacement of concrete streets and driveways. The Project will include surveying, hydrologic and hydraulic modeling, and estimates and evaluation of several options for construction. The Project may include the following supplemental services: geotechnical, traffic engineering, and resident inspection services.