The successful Bidder will be expected to complete the requested scope, at and under the Authority’s direction, to Furnish and Install Aircraft 400 Hz Ground Power Units in Terminal 2 and Terminal 4. The work shall include scope confirmation, shop drawings, and permitting. Construction work under this contract shall include fabrication, delivery, removal and disposal of existing units, installation, testing, and acceptance of Passenger Boarding Bridge mounted Ground Power Units at Twenty-Two (22) Narrow Body Group III and Regional Jet Gates, and Two (2) Wide Body Group IV and V Gates, which will be identified by the Attachment A-Plan View and Equipment Schedule. Proposer shall inspect the existing electrical service at each Gate and confirm that the new Ground Power units are compatible with the existing electrical service. Proposer shall be responsible for reestablishing all power and communication connections to the proposed unites to provide a complete and operable installation. Bidder shall be responsible to ensure that the equipment and installation meet all applicable Local, State, and Federal codes and ordinances.,,