Project Scope: Contractor will use a Hydro Axe, Tiger Cat, Bobcat with attachment, excavator with attachment, or equivalent machine to cut down selected trees/brush. Selected trees/brush shall be marked for cutting or selected by written prescription. Trees/brush shall be cut down to four inches above ground level or less. Trees that are not marked or prescribed for removal shall not be damaged and remain untouched by treatment activities. This activity will take place in a variety of vegetation types and terrains. • Species may include all native or non-native tree species or woody materials located at a project site. • Contractor shall provide all necessary labor, insurance, supplies, equipment, and materials needed to successfully complete the project.