Realignment of approximately 1,500 feet of Hopkins Road north of East McCart Street (FM 1173). The construction efforts will include roadway, sidewalk, bridge, storm sewer, sanitary sewer, mass grading, and channelization. 1 Tx500 Mobilization and Demobilization (5% Max) 1 LS $ $ 2 31 25 00 Erosion and Sediment Control (SWPPP) 1 LS $ $ 3 SP-1 Project Signs 2 EA $ $ 4 34 71 13 Barricades, Signs, and Traffic Controls 1 LS $ $ 5 02 41 00 Prepare Right-of-Way 25 STA $ $ 6 SP-2 Sawcut and Remove Existing Asphalt 2,170 SY $ $ 7 SP-2 Sawcut and Remove Existing Concrete Drive 245 SY $ $ 8 SP-3 Remove and Replace Soft Subgrade with Flexible Base 200 CY $ $ 9 32 16 23 6'' Class C Concrete Sidewalk 1,773 SY $ $ 10 32 16 23 4'' Class A Concrete Sidewalk 707 SY $ $