1. New work includes, but is not limited to, removal of existing 30kW generator and associated cables, conduit, boxes, etc. Generator to be turned over to Owner. 2. Procurement and installation of a new 80 kW natural gas generator. 3. The furnishing and installation of a new 400A NEMA 3R service entrance rated automatic transfer switch. 4. The removal and disposal of existing 600A disconnect and the work to connect the existing service to the new ATS. 5. New underground gas piping shall be provided from the existing gas meter location to serve new generator. contractor shall coordinate with the utility provider to determine if a new gas service/meter will be required to accommodate the added load of the new generator.