THE PROPOSED PROJECT INCLUDES THE INTERIOR FIT-OUT OF EXISTING MECHANICAL/ STORAGE ROOMS INTO GENDER NEUTRAL CHANGING ROOM AND TOILET ROOM FACILITIES. INDIVIDUAL COMPARTMENTS ARE PROVIDED IN THE TWO OVERALL NEW ROOMS TO PROVIDE PRIVACY FOR OCCUPANTS. THE SCOPE INCLUDES NEW DOOR OPENINGS IN EXISTING NON-BEARING CMU WALLS, WITH STEEL MEMBERS (POSTS, ANGLES, LINTELS) TO BE INSTALLED TO SUPPORT THE OPENINGS. NEW CFSF STUD WALLS WILL BE PROVIDED FOR THE NEW INTERIOR PARTITIONS, WHICH WILL BE CLAD IN GLAZED CERAMIC TILE OR WILL BE PAINTED. NEW PLUMBING FIXTURES ARE SPECIFIED FOR THE TOILET ROOMS. ALL NEW ROOMS WILL BE PROVIDED WITH NEW LIGHT FIXTURES, ELECTRICAL RECEPTACLES, AND EXHAUST. HVAC FOR THE ROOMS WILL BE PROVIDED VIA CONNECTIONS TO EXISTING ADJACENT AHU'S AS WELL AS NEW ABOVE CEILING FAN COIL UNITS TIED TO THE EXISTING DUAL TEMP LOOPS. SANITARY FOR THE NEW PLUMBING FIXTURES WILL INVOLVE TRENCHING OF THE EXISTING FLOOR SLAB TO ALIGN WITH EXISTING MAIN LINES IN THE CORRIDOR. A NEW ACCESSIBLE TRANSFER SHOWER IS INCLUDED AS AN ADD-ALTERNATE IN THE DESIGN.