The following shall be required of the Contractor to install a 64.8 kW rooftop solar at the City’s new library: • Source and procure all necessary equipment and components • Install all electrical components and coordinate with utility provider for interconnection • Perform testing and quality control • Provide training for city personnel • System design and engineering. Contractor shall furnish all necessary labor, materials, and standard business equipment needed to complete the work. All work will require review and acceptance by the City. The selected site has been assessed for its solar rooftop potential, and details are provided in Appendix 1. The Contractor will act to protect the City’s interests, keeping any and all work specified herein under fiscal control, on schedule and providing total quality assurance management driving towards the desired outcomes. The City seeks to own the project and associated assets, including but not limited to: RECs and/or other environmental attributes, tax credits and Federal, State or other grants and aid. In order to receive the full 30% base elective pay commensurate with pre-IRA levels, the Contractor must submit a proposal that meets the state of Maryland’s prevailing wage and apprenticeship requirements. The proposal must meet domestic requirements in compliance with State Finance and Procurement Article §§ 14-416 and 17-303, Annotated Code of Maryland.