MOBILIZATION 1.000 LS CLEARING AND GRUBBING 1.000 LS REMOVAL OF BRIDGE @ STA. 2+98 (SITE "A") 1.000 UN REMOVAL OF BRIDGE @ STA. 3+37 (SITE "A") 1.000 UN REMOVAL OF BRIDGE @ STA. 3+50 (SITE "B") 1.000 UN REMOVE AND RELAY RIPRAP 540.000 SY UNCLASSIFIED EXCAVATION (F.M.) 3,953.000 CY BORROW EXCAVATION (F.M.E.) (CONTRACTOR FURNISHED) (CLASS 9 ) 146.000 CY CHANNEL EXCAVATION (F.M.) 1,528.000 CY EXCESS EXCAVATION (F.M.) 200.000 CY STRUCTURE EXCAVATION 1,641.000 CY TEMPORARY STREAM DIVERSION 2.000 EA GRANULAR MATERIAL, (CL. 4, GP.B) 3,687.000 TON CRUSHED STONE, SIZE 57 625.000 TON SIZE 2 STABILIZER AGGREGATE, COARSE 451.000 TON 24" REINFORCED CONCRETE PIPE, CLASS III 80.000 LF ROADWAY CONSTRUCTION SURVEYING 1.000 LS RIGHT-OF-WAY MARKERS (TYPE II ) 29.000 EA MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF