Contractor shall furnish receptacles for garbage, rubbish, construction/bulky and basin waste to be placed, as per the County's site-specific requirements listed in this specification. Containers and or compactors provided by Contractor shall be constructed of metal with covers. Mechanism for compactor operation will be maintained by the Contractor. Containers must be on wheels and have a flip top cover. County Personnel shall be able to lift and close covers with ease. Roll-offs shall be open. Size is also stated on the site-specific list. Contractor is responsible for maintenance and repair of all. 3.4 The receptacles provided by the Contractor and any provided by the County of Essex shall be returned to the exact location that they are removed from prior to emptying contents, unless specifically directed by the County designee to change the location...