0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 120 0003 090200 DISPUTE RESOLUTION ADVISOR ON-SITE MEETING EA 4 0004 090207 HOURLY OFF-SITE DISPUTE-RESOLUTIONADVISOR-RELATED TASKS HR 10 0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0007 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 75 0008 130100 JOB SITE MANAGEMENT LS LUMP SUM 0009 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0010 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0011 141103 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) LF 20,100 0012 141104 REMOVE YELLOW THERMOPLASTIC PAVEMENT MARKING (HAZARDOUS WASTE) SQFT 500 0013 280200 REPLACE BASE CY 180 0014 360200 BASE BOND BREAKER SQYD 5,320 0015 377501 SLURRY SEAL TON 2,650 0016 390095 REPLACE ASPHALT CONCRETE SURFACING CY 1,490 0017 390137 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 360 0018 397005 TACK COAT TON 1 0019 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3,560 0020 410096 DRILL AND BOND (DOWEL BAR) EA 4,260