0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 360 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 8 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120165 CHANNELIZER (SURFACE MOUNTED) EA 230 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 320 0010 120320 TEMPORARY BARRIER SYSTEM LF 10,600 0011 129100 TEMPORARY CRASH CUSHION MODULE EA 310 0012 129105 TEMPORARY CRASH CUSHION TL-2 EA 1 0013 129108 TEMPORARY CRASH CUSHION TL-3 EA 19 0014 130100 JOB SITE MANAGEMENT LS LUMP SUM 0015 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0016 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 42 0017 130331 STORMWATER ANNUAL REPORT EA 4 0018 130570 TEMPORARY COVER SQYD 9,520 0019 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 100 0020 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 4