This project aims to improve intersection operational efficiency by adding an eastbound left-turn storage lane and a bypass through lane on Toney Penna Drive (TPD), as well as an exclusive left-turn lane on the southbound approach at the TPD and Bush Road intersection. These improvements are designed to facilitate left-turn movements from Bush Road and enhance the overall level of service at the intersection. Additional improvements include the installation of a crosswalk and drainage system between the Jupiter Village Park entrance and the Timberwalk community driveway. The scope of work includes, but is not limited to: mobilization, maintenance of traffic, clearing and grubbing, erosion control, removal of existing concrete, embankment, pavement widening, milling and resurfacing, installation of drainage structures, concrete curb and gutter, traffic separators, sidewalks and driveways, signage, pavement markings and raised pavement markers, detectable warnings, and sodding.