The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements generally described as follows: Construction of 3900 feet of EP True Parkway from Grand Prairie Parkway to Future Bridgewood Boulevard including 29 acres of Clearing and Grubbing, 27,927 CY of Topsoil Strip, Salvage and Spread, 118,100 CY of Excavation. 4,838 LF of Storm Sewer and 52 Storm Sewer Structures. 5,410 LF of Subdrain and Subdrain Outlets. 20,440 LF of Conduit and Vaults. 4,057 LF of Water Main, Fittings, Valves and Hydrants. 28,914 SY of 8.5 inch Reinforced PCC Pavement, 4,283 SY of 6 inch Reinforced PCC Shared Use Path and 425 SY of 6 inch PCC Driveway. Erosion Control, Seeding and Surface Restoration, Pavement Markings, Construction Survey, and other Miscellaneous Construction.