The Project, including mobilization and demobilization, consists of furnishing and installing all materials, labor, and equipment for the relocation and upgrade of the existing PS 0046, including but not limited to: demolition of the existing station; abandonment of existing gravity mains and existing receiving manhole; bypass and flow control operations; construction of new submersible pump station with wet well, valve bank, submersible pumps, and all valves and piping; installation of new electrical equipment including submersible control panel; installation of approximately 50 feet of 6” ductile iron pipe force main; installation of a new receiving manhole and approximately 310 linear feet of 8” PVC gravity main; all testing and start-up operations; traffic control; temporary and permanent replacement of any pavement, driveways, sidewalk, concrete median, curb and gutter, sod, landscaping and pavement markings damaged by the construction of the Project, and all other appurtenant and miscellaneous items and work necessary for a complete, fully functional, and satisfactory installation.