The scope of work for this project is additionally detailed in the documents associated with the Division of the State Architect’s Application Number 03-124951, but, broadly, include: • Construction of cantilever steel netting support posts • Netting installed from post to post and attached to existing nettings • Substitute netting materiel is acceptable with prior approval • Provide documentation for possible partial or full site closures, including for portions of the public right of way or fields, as necessary • Provide timeline for work completion, including critical path. • Provide timeline for phasing, especially if work is not to be completed by re-opening of school. Users are scheduled to be on some fields throughout the construction period, and school will be re-opened for staff/student use on August 19th • Provide description of protective measures to be utilized throughout the construction period