The work, officially known as Project No. 24003, Police Department Parking Lot Rehabilitation – Phase 2, consists of constructing the following approximate quantities: Removing Curb & Gutter 300 LF Removing Concrete Sidewalk 6 SY Excavation Common 2607 CY Base Aggregate Dense 1 1/4-Inch 20 TON Concrete Curb & Gutter 31-Inch (UNDISTRIBUTED) 300 LF Concrete Sidewalk 5-Inch 50 SF Curb Ramp Detectable Warning Field Natural Patina 20 SF Adjusting Inlet Covers 2 EACH Pipe Underdrain 6-Inch 836 LF Inlet Protection Type D 6 EACH Geotextile Type SAS 4125 SY Marking Symbol Epoxy 2 EACH Marking Parking Stall Epoxy 1300 LF Sawing Asphalt 75 LF Sawing Concrete 305 LF Traffic Control 1 EACH Restoration Type B (UNDISTRIBUTED) 300 SY EDPM Liner 140 SY Undercut, Undistributed 1000 TON Base Layer, No.2 Stone 2961 TON Base Layer, No 57 Stone 1252 TON Porous Asphalt 12.5mm 901 TON