SCOPE OF WORK A. The scope of work for this project consists of, but is not necessarily limited to, the following: 1. Contractor will complete all tasks necessary to complete the Renovation Project as outlined in the Project Manual. 2. The Project Manual contains a draft copy of the Modified AIA A201 General Condition of the Contract for Construction, a draft copy of the Modified AIA A101 Standard Form of Agreement Between Owner and Contractor and a draft copy of the Modified AIA A101 Exhibit A Insurance and Bonds. 3. The drawings and specifications of the contract are intended to require the contractor to provide everything reasonably necessary to accomplish the proper and complete finishing of the work. 4. All work and materials included in the specifications and not shown on the drawings or shown on the drawings and not in the specifications, shall be performed and/or furnished by the contractor as if described in both. B. Please refer to the Project Manual, Drawings, and Specifications found on our website for a detailed and complete scope of work. C. Substantially completed by 10/15/2025. D. Liquidated Damages: $500 per day E. Use of Premises 1. Contractor shall restrict work, staff, and debris to the contract premises and as authorized by the University. Contractor is responsible for coordination of trades to ensure timely completion of work and to minimize disruption of the activities of the University. 2. Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond the site perimeter unless prior approval of the University is received prior to conduction of such work or operations. 3. Driveways & Entrances: Keep driveways and entrances serving premises clear and available to Rowan University, Rowan employees, and emergency vehicles always. 4. Do not use areas outside the limit of construction site for parking or storage of materials. 5. Upon completion of work, the awarded vendor is responsible for leaving any construction areas in clean condition.