The existing traveling screen was installed as part of the Raw Water Intakes original construction in 1970. The existing screen is a Model 45A Water Traveling Screens manufactured by Link-Belt Engineering Group. i. The existing screens are powered by a three-phase 480 volt, 1 HP motor having an electrical disconnect panel located just adjacent to the upper “doghouse” of the screen assembly. 1) The Contractor for this work will be provided electricity for the replacement screens at the existing disconnect; 2) Any and all electrical work, including all labor, equipment, and materials, necessary for the proper connection of the replacement screens, including the acquisition of and payment for applicable permits, shall be the Contractor’s responsibility. ii. The COA consultant’s inspection of the steel structure on which the Link-Belt 45A was installed indicate it to be in good condition and will require no repairs or alterations, aside from those necessary for the Contractor’s installation of their replacement screen assembly. Such modifications shall be included in the total price of the Contractor’s proposal. iii. Removal and proper disposal of the existing Link-Belt 45A assembly shall be included in the Contractor’s proposal. The contractor shall make a good-faith effort to recycle materials from the existing screens, with proceeds from recycling retained by the contractor. iv. Any modifications to the existing piping that supplies finished water to or removes wash water from the replacement screens shall be the Contractor's responsibility, and costs for the same shall be included in the Proposal. v. PDF files of available documentation of the existing traveling screens are available upon request from David Marcum, (865) 380-4800.