1 Mobilization 1 LS 2 Testing Allowance $10,000.00 $10,000.00 3 Traffic Control 1 LS 4 Soil Erosion Control 1 LS 5 Removal, Curb and Gutter 90 LF 6 Removal, HMA Roadway 3,200 LF 7 Remove and Replace Unsuitable Soil 21,700 CYD 8 Removal, Driveway 35 EA 9 Removal, Tree, 8-18" 363 EA 10 Removal, Tree, 19"-24" 61 EA 11 Removal, Tree, 25"+ 61 EA 12 Removal, Stump 8 EA 13 Land Clearing 1 LS 14 Water Main, DI 8-inch, Tr Det B 17,950 LF 15 Water Main, DI , 8-inch, HDD 1,200 LF 16 Water Main, DI 12 inch, Tr Det B 10 LF 17 Water Main, 8" Fitting 50 EA 18 Water Main, 12" Fitting 5 EA 19 Water Main, Polyethylene Encasement 19,150 LF 20 Water Main, 8" Valve and Box 32 EA 21 Water Main, Hydrant Assembly 34 EA 22 Water Main, Auto Flusher 1 EA 23 Water Main, 1-1/4" Water Service, Inside of ROW 1,700 LF 24 Water Main, 1-1/4" Water Service, Outside of ROW 5,000 LF 25 Water Main, 1-1/4" Water Service, Private 6,000 LF