A. The work under this section comprises the furnishing and installation of food service equipment and custom serving counters and sneeze guards as shown on the drawings and herein specified or otherwise noted. Electrical, plumbing, and other work as made necessary by the modifications herein shall be done by licensed tradespeople supplied by Kitchen Equipment Contractor (herein described as KEC). The scope of each individual project is detailed further in the item specifications below. 1. Coordination of work. It is imperative to facilitate a smooth installation that the Kitchen Equipment Contractor (KEC) closely coordinate its work with Child Nutrition and with Leominster Public Schools personnel. Such coordination should include scheduling of installation to ensure that any trades and installation personnel will not interfere with the normal operation schedules in each school where work is to be performed, and that the jobsite will be ready to accept the food service equipment as indicated in the Contract Documents. 2. The scope of this project shall consist of providing new serving line equipment along with electrical, delivery and set-in-place as described in specifications for Samoset Middle School. Contractor must also allow for any dumpsters needed during demolition of existing equipment.