1 . 1 LS MOBILIZATION/DEMOBILIZATI ON, (to include but not limited to set up staging work areas, and restoration after the construction, (not to exceed 6% of the total sum bid, excluding price for mobilization, any allowances or force account items) LS $_________ $_________ 2 . 1 EA TEMPORARY PROJECT SIGN (to include but not limited to providing temporary project sign and removal after the completion of the project) EA $_________ $__________ 3 . 1 LS TEMPORARY BMPs, (to include but not limited to providing of temporary sediment filters for catch basins, temporary filter socks, portalet, maintenance, and removal after the construction. LS $_________ $_________ 4 . 1 LS TRAFFIC CONTROL MEASURES, (to include but not limited to providing temporary traffic signage, channeling devices, required regulatory and warning signs, and removal after the construction. Provide flaggers or police officers as per plan during construction. LS $_________ $__________ 5. 82.3 LF REMOVE EXISTING 8” SEWER LINE AT PUHA STREET BETWEEN EXISTING SMHs #4138899 AND #4138901 (to include but not limited to saw cutting existing asphalt pavement, excavation, shoring installation, disconnecting lateral pipes, removal of existing sewer pipe, and proper disposal of removed and excavated materials as per plan and specifications) /LF $_________ $__________ 6 82.3 LF INSTALL NEW 8” SEWER LINE AT PUHA STREET BETWEEN EXISTING SMHS #4138899 AND #4138901 (to include but not limited to installing new sewer pipe, connecting to existing sewer manhole, and laterals, removal of shoring, backfilling, compaction and repaving of excavated asphalt paving to match existing as per plan and specifications) /LF $_________ $__________