Turnpike Drainage replacing 7 pipes at 6 location on Spaulding Tpk. in Milton. 203.11 COMMON EXCAVATION - LRS CY 21.00 203.601 EMBANKMENT-IN-PLACE CY 22.00 206.1 COMMON STRUCTURE EXCAVATION CY 145.00 209.1 GRANULAR BACKFILL CY 33.00 403.11023 HBP-3/4" BINDER MIX, MACHINE METHOD TON 25.00 403.11053 HBP-3/8" SURFACE MIX, MACHINE METHOD TON 75.00 403.12 HBP-HAND METHOD TON 5.00 403.16 PAVEMENT JOINT ADHESIVE LF 300.00 403.19 HBP-TEMPORARY TON 15.00 410.22 ASPHALT EMULSION FOR TACK COAT GAL 35.00 503.101 WATER DIVERSION STRUCTURE U 1.00 503.102 WATER DIVERSION STRUCTURE U 1.00 503.103 WATER DIVERSION STRUCTURE U 1.00 503.104 WATER DIVERSION STRUCTURE U 1.00 503.105 WATER DIVERSION STRUCTURE U 1.00 503.106 WATER DIVERSION STRUCTURE U 1.00 520.1 CONCRETE CLASS A CY 25.00 544.1 REINFORCING STEEL (ROADWAY) LB 590.00 571.1 REPAIRING AND POINTING STONE MASONRY SY 100.00 585.2 STONE FILL, CLASS B CY 35.00 585.3 STONE FILL, CLASS C CY 70.00