0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 30 0003 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0004 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0005 130100 JOB SITE MANAGEMENT LS LUMP SUM 0006 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0007 130640 TEMPORARY FIBER ROLL LF 280 0008 130680 TEMPORARY SILT FENCE LF 150 0009 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0010 146002 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS LUMP SUM 0011 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2 0012 037634 HYDRAULIC BIOTIC GROWTH MEDIUM SQFT 5,860 0013 210255 FIBER REINFORCED MATRIX (SQFT) SQFT 5,860 0014 210270 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 5,180 0015 210350 FIBER ROLLS LF 680