The Contractor is to repair/overlay/ resurface the following street: Mission Trace Drive; The Contractor shall restripe in-kind all existing roadway markings at existing locations on roadways and as currently marked if compliant with the 2023 Edition of the MUCTD otherwise, the Contractor is to bring the markings up to the current MUCTD standard. The Contractor shall remove and replace any non-ADA compliant sidewalk ramps with ADA compliant ramps with warning detectors at the restriped crosswalks. The Contractor is to prepare the areas for installation of the pavement repairs. This includes removal of “cold patch”, lime rock, and existing asphalt, compaction of the existing subgrade, etc. a. Contractor to remove additional pavement a minimum distance of 12 inches on each side of the existing cuts / failed pavement or as directed by the City Engineer, b. Contractor to remove existing lime rock base as needed.