The proposed scope of work includes, but is not limited to rehabilitation of the Salt Works Pump Station including required site clearing and grubbing, demolition of the existing pump station, demolition and removal of existing generator, controls and 300-gal day tank and fill box, including modifications to the existing subsurface concrete structure, construction of a new valve pit and meter pit, modification of an existing bypass pit, a six (6) ft diameter influent manhole, 18” PVC influent sewer, site piping improvements, installation of a new motor control center and all electrical work, special protective coatings, installation of a sound attenuated 125 kW engine generator, all surface improvements, site improvements, fencing and automatic gate, CMU retaining wall, drainage improvements, pavement restoration, temporary controls, temporary bypass pumping, nighttime pump station shutdowns as required, permit compliance, and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer.