2.2.7.1.1 The Contractor must have an experienced laundry technician visit the laundry managers of each of the above facilities on a monthly basis. 2.2.7.1.2 The first visit is to be made during the first week of service under the contract to instruct the contract. 2.2.7.1.3 The Contractor will supply cups, scoops and sour indicator in plastic bottles as required to control use of materials. Where the equipment will adapt, the vendor shall provide automatic dispensing systems. The preferred system should be air operated diaphragm pumps for ease of maintenance and reduction of downtime due to pump to tubing failure. The vendor shall maintain the dispensing system as well as train the personnel on the proper use. At the end of the contract, the dispensing system will remain the property of vendor, unless the removal will cause the equipment to be damaged. In that case, the equipment will become the property of the State.