CK DECK REMODEL $__________________________________ __ The entire back deck will be taken down and rebuilt. (same size and configuration as existing) __ All support posts shall be set in masonry. __ Fabricate and install guardrails and handrails on the deck and steps. __ All materials shall be pressure treated lumber, and all fasteners galvanized. __ Install pickets to ensure a 4” sphere cannot pass through any opening. KITCHEN REPAIRS $_________________________________ __ Replace lower sink countertop only __ Install a new hardwood base cabinet in the kitchen. (same size as old one) __ Install a new countertop (match color and design as close as possible) stainless steel double bowl sink, new drain lines and trap, and lever style Delta or Moen faucet equipped with sprayer. (Homeowner’s choice of counter color and pattern) __ Remove the old cabinet and replace with same size new lower cabinet (Homeowner’s choice of color) BATHROOM CEILING (main bathroom) $__________________________________ __ Remove old paint on ceiling __ Paint ceiling and ceiling molding/trim __ Paint entire ceiling LOWER DEN FLOORING REPAIRS $___________________________________ __ Clean flooring __ Install appropriate underlayment as recommended by the manufacturer. __ Install minimum 25-year sheet vinyl goods and install finished shoe molding around room. (Homeowner’s choice of color and pattern) SAFETY $___________________________________ __ Install battery operated smoke detectors in each bedroom. __ Install a combination smoke/CO detector in a common area. __ Install a fire extinguisher in the kitchen area.