The project includes the demolition of the existing airfield electrical vault, construction of a new electrical vault building, installation of new vault equipment, temporary power provisions, coordination of airfield lighting controls, and associated civil, electrical, and utility work. The work includes all labor, materials, equipment, and incidentals required to complete the project in accordance with the contract documents. Airport lighting circuits shall be maintain operational for the duration of the project, except during scheduled night-time closures. Demolition of existing electrical vault and FAA buildings Installation of temporary electrical vault and temporary generator, including temporary back up generator (standby generator required) Airfield lighting control system modifications and fiber optic connection to ATCT Construction of new electrical vault building Installation of new vault electrical equipment and standby generator Site grading, drainage improvements, asphalt pavement patching, and turf establishment Coordination with utility companies and regulatory agencies (FAA, Georgia Power, etc.)